What the numbers reveal about data migration

Avant d’entrer dans les 5 risques spécifiques à la migration PLM/CAO, il faut regarder en face la réalité statistique des migrations de données dans l’industrie IT.

83%

Of data migration projects fail or significantly exceed their budgets and timelines.

Source : Gartner

+30%

Average cost overrun observed in data migration projects that exceed their budgets.

41%

Average schedule overrun in troubled migration projects, equivalent to an additional 2.5 months on a 6-month project.

Source : Bloor Research

56%

Less value delivered than originally expected, on average, by large-scale IT projects.

⚠️

The most underestimated figure

McKinsey estimates that 17% of large-scale IT projects perform so poorly that they threaten the very existence of the company. According to the McKinsey & University of Oxford study, only 1 in 200 projects meets its original timeline, budget, and scope simultaneously. For ERP migration projects specifically, between 55% and 75% fail to achieve their initial objectives.

These statistics relate to IT migrations in general. In PLM and CAD environments, however, specific factors make the risks even greater: technical data is structurally more complex than business data, involving multi-level hierarchical relationships, native links between CAD files and metadata, and revision histories that must remain intact to ensure regulatory traceability. A data corruption issue in an ERP system may result in an accounting error. In a PLM system, the same issue can lead to production downtime or non-compliance during a customer audit.

– First step

🔎  Are your technical data ready for a new PLM system?

Our experts at KLERIA can help you prepare, clean, and structure your CAD and BOM data before migration.

The 5 critical risks of PLM/CAD migration without proper data preparation

Behind every recurring non-conformity lies a systemic cause. In an industrial environment where the ERP system serves as the central source of truth and interacts with a PLM, MES, quality management tools, and suppliers, these causes almost always trace back to the quality of master data.

Risk 01

Loss of or inability to access CAD drawings and design data

Native CAD files (CATIA, Creo, NX, SolidWorks) are not ordinary office files. They contain structured metadata, including revision, status, author, and links to parent assemblies, all of which must be preserved during a PLM migration. When this metadata is not correctly mapped to the target data model, the file is migrated but its relationships are lost. The drawing exists in the system, but it can no longer be retrieved through the BOM or Part Number.

In Windchill or Teamcenter environments, relationships between objects (Part – Document – CAD Document) are managed through vault structures whose logic varies depending on versions and configurations. Migrating without first mapping these structures is essentially a blind migration.

Real-world example: Aerospace supplier

Following a migration from Windchill to ENOVIA/3DEXPERIENCE, 12% of the CAD drawings belonging to a critical product family became inaccessible through the product structure. The files were physically present in the vault, but version metadata and relationships with Part Numbers had been truncated during mapping.

Manual reconstruction took 6 weeks and required 3 manufacturing engineers to be reassigned. Production in the affected area was suspended. The estimated cost exceeded the initial migration project budget for this scope alone.

💡 What proper preparation helps prevent A preliminary audit of vault structures and CAD-Part-Document relationships, followed by a migration test using a representative sample of real data (not dummy data), identifies truncation risks before go-live, not after.

Risk 02

BOM structure corruption and loss of revision history

A BOM (Bill of Materials) in an industrial PLM system is not a flat list. It is a multi-level hierarchical structure involving typed relationships (component-assembly, variant-configuration), version-controlled revisions, workflow statuses (In Work, Released, Obsolete), and links to the ECOs/ECNs that justified each change. This structural complexity is precisely what generic migration tools often fail to handle correctly.

During migration, a revision management mapping error can result in BOMs being migrated with the correct revision number displayed as text, but with links still pointing to components from the previous revision. The result: a BOM that looks correct on screen but references obsolete components in production.

Risque 03

Breaking the PLM–ERP digital thread: misalignment between technical and business data

In a mature industrial organization, PLM and ERP systems share a common repository of parts and bills of materials. PLM is the source of creation and validation for design data, while ERP uses this data for procurement, planning, and production. This integration relies on interfaces (APIs, connectors, middleware) configured around specific data identifiers: Part Numbers, revisions, and statuses.

When a PLM migration changes identifiers or data structures without updating ERP interfaces accordingly, the digital thread is broken. Purchase orders may continue to reference identifiers that no longer exist in the new PLM system, or production BOMs in ERP may no longer reflect the structure approved in PLM.

Silent integration failures are among the hardest risks to detect. Everything appears to work until the first real need for cross-system traceability.

> Real-world example: Multi-site industrial company

Following a migration from Windchill to ENOVIA, the PLM-SAP integration connector continued using legacy Windchill identifiers as join keys. These identifiers had been transformed during migration.

For four weeks, BOM updates approved in ENOVIA were no longer propagated to SAP. Production planners continued working with outdated, frozen BOMs. The discrepancies were only detected when the first manufacturing order was launched for a product modified after migration.

💡 The figure to remember 44% of US organizations report that data quality issues have caused delays in their migration projects (Experian). In PLM-ERP environments, this figure is likely to underestimate the actual problem: integration mismatches are often not classified as “migration incidents” until they cause visible operational disruption.

Risk 04

Loss of regulatory traceability and engineering change history

In regulated industries such as aerospace (DO-178, AS9100), automotive (IATF 16949), defense, and medical devices (ISO 13485), design decision traceability is not optional. It is a contractual and regulatory requirement.

Every component change must be traceable to an approved ECO/ECN, including its justification, validations, and corresponding signatures.

During a PLM migration, ECO workflow histories (intermediate statuses, comments, approvers, dates) are often among the first data sets to be sacrificed. This happens either because they do not match the target data model or because they represent large volumes that make migration more complex.

The seemingly practical decision to “migrate active data only” can therefore create a significant compliance risk during the next customer or regulatory audit.

Risk 05

Production disruption at go-live due to unplanned budget overruns and delays

The fifth risk is the most systemic and the hardest to anticipate during the initial project scoping phase.

When the four previous risks materialize simultaneously at go-live, the project team is forced into an operational crisis: engineers are reassigned to manually reconstruct data, production cannot launch manufacturing orders due to unreliable BOMs, ERP interfaces are silently broken, and management expects immediate explanations. This scenario is not an extreme exception. It reflects a recurring pattern.

Only 16% of data migrations are completed within their original timeline and budget (Bloor Research). Projects that exceed their budgets experience an average cost overrun of 30% and a schedule overrun of 41%.

For a six-month PLM migration project with a €500,000 budget, this translates into an additional €150,000 in unplanned costs and a 2.5-month delay to go-live.

> What McKinsey reveals about the causes of project overruns

McKinsey identifies source data quality as one of the most common causes of overruns in large-scale IT projects. Specifically for migration projects, 44% of teams cite underestimating data volumes and complexity as the main cause of budget overruns (Experian).

Data migration is never “just a transfer from A to B”. It is a transformation, and the depth of that transformation is directly proportional to the quality of the source data.

💡 The cost of post-go-live firefighting vs. the cost of preparation

A PLM data Flash Audit conducted before migration costs only a fraction of post-go-live remediation. Manually reconstructing lost CAD drawings, correcting corrupted BOMs, and rebuilding ECO histories are highly labor-intensive activities, typically 3 to 5 times more expensive than preventing these issues in the first place.

And they happen in the worst possible conditions: a team exhausted by the migration, impatient management, and production waiting to resume.

Zéro donnée perdue. Zéro incohérence. Zéro surprise.

Before transferring thousands of CAD files, BOMs, revisions, and historical records, make sure your data is reliable, consistent, and ready to use.

Complete the form to speak with our specialists and secure your PLM migration.




    Summary table: 5 risks, root causes, and warning signs

    Certain operational warning signs indicate that recurring quality issues originate in master data quality rather than process or equipment failures. Here is what to look for.

    Managing non-conformities: going beyond corrective action

    ISO 9001:2015 requires organizations to implement a structured non-conformity management process. In practice, however, this process often stops at immediate corrective action without investigating the underlying systemic documentation issues.

    Here is how to structure a process that goes all the way back to the source.

    Risk Most common root cause Warning sign before go-live Post-go-live impact
    Loss of CAD drawings Incomplete mapping of vault structures and CAD-Part relationships Migration tests performed on dummy data instead of real data Critical Production of parts without drawings
    Corrupted BOMs Revision management incorrectly mapped between source and target systems No business validation testing by the engineering department Critical Manufacturing orders based on unapproved specifications
    Broken PLM–ERP digital thread Interfaces not updated after changes to data identifiers PLM-ERP integrations not tested in the target environment High Procurement relying on outdated master data
    Loss of traceability ECO histories excluded from migration to reduce data volume "Active data only" policy without mapping regulatory requirements Critical Non-compliance during customer audits
    Budget overruns and go-live disruption Source data not audited — data volume and quality underestimated No data audit before migration begins High +30% average cost overrun, +41% schedule delay

    How to identify whether your non-conformities originate from data quality issues

    Pressure on PLM migrations has never been greater than in 2026, driven by three converging trends that are shortening decision-making windows for CIOs and Manufacturing Directors.

    1. The end of legacy Windchill licenses and the shift to Windchill+

    PTC introduced its new ePLM licensing model on July 1, 2025. Existing Windchill license packages moved to a “renewals only” model. As of September 30, 2026, legacy licenses can no longer be renewed. Companies still running Windchill 12 (whose standard support ended in June 2024) or Windchill 13 (with support scheduled to end in June 2027) face two simultaneous pressures: end of support and end of licensing. This constraint forces migration decisions that some manufacturers would otherwise have preferred to postpone.

    2. The SAP S/4HANA migration is also driving PLM changes

    The migration to SAP S/4HANA (with the 2027 deadline for standard ECC support) is not an isolated ERP project. It requires companies to review their existing PLM-ERP interfaces, which, in most industrial architectures, means migrating or significantly redesigning PLM connectors. These two projects often run in parallel, creating additional pressure on IT and engineering teams.

    3. Industry 4.0 ambitions require a clean digital thread

    Digital twin, predictive maintenance, and industrial AI projects all rely on a common prerequisite: a clean, traceable, and consistent digital thread connecting PLM, ERP, and MES systems.

    Gartner predicts that by 2030, more than 30% of industrial manufacturers will rely on a PLM-based digital thread to contextualize data used to train their AI models (Manufacturing Predicts 2026, Gartner, décembre 2025). But these systems cannot deliver reliable results with degraded data. A poorly prepared migration is one of the fastest ways to permanently undermine the quality of technical master data.

    How KLERIA secures your PLM/CAD migration before it begins

    The main problem with poorly prepared PLM migrations is not technology. It is the sequence of operations. Companies choose the target system, sign the licenses, launch the migration project, and treat source data quality as a final project task. By that stage, it is already too late to prevent problems. The project is in reactive mode.

    KLERIA’s Zero-Backlog Engine™ methodology reverses this sequence. Source data auditing comes first, before target system configuration, before mapping, and before testing. We take care of this analysis and preparation work so your team can execute the migration using data that has already been assessed and qualified, rather than discovering problems at go-live.

    Phase 0 

    Flash PLM audit

    Review of data volumes, CAD-Part structure condition, BOM completeness, and available ECO histories. A risk assessment report delivered within 48 hours.

    Phase 1

    Mapping and profiling

    Analyse des structures PLM sources, identification des relations à risque, cartographie des dépendances avec l’ERP et le MES.

    Phase 2

    Data cleansing and qualification

    Removal of duplicate Part Numbers, correction of inconsistent BOMs, reconciliation of ECO statuses, and validation of CAD-Part relationships.

    Phase 3

    Migration preparation

    Definition of source-to-target mapping rules, migration testing using real data, and validation by engineering and manufacturing teams.

    Phase 4

    Validation and go-live

    Source-to-target reconciliation by data domain, quality certification of migrated data, and verification of PLM-ERP interfaces after migration.

    📌 Results achieved on a comparable project More than 7,000 Part Numbers processed and qualified in 90 days, with a measurable reduction in recurring non-conformities related to item master data within the project scope. The internal quality team was freed from repetitive corrective work and able to focus on continuous improvement.

    FAQ: PLM CAD data migration

    PLM migrations involve complex technical data structures, including multi-level BOMs, native CAD file relationships, revision histories, and engineering change records. Unlike standard business data, these elements are interconnected. If their relationships are not properly mapped and validated, migration can result in missing drawings, corrupted BOMs, and broken traceability.
    Start with an audit of your source data before configuring the target system. Assess data volumes, identify duplicates and inconsistencies, map CAD-Part relationships, verify BOM structures, and review revision and ECO histories. Then test the migration using representative real data and validate the results with engineering and manufacturing teams.
    Drawings may remain physically stored in the system while becoming inaccessible through product structures, BOMs, or Part Numbers. This can disrupt engineering workflows, prevent production from accessing approved documentation, and create traceability issues. Manual reconstruction can be costly and time-consuming.
    Not necessarily. However, migration decisions must account for regulatory, contractual, and operational traceability requirements. Historical ECO/ECN records, revision histories, and approval workflows may be essential for audits and product lifecycle management. A data retention and migration strategy should be defined before excluding any historical records.

    Sans engagement · Résultat en 48h

     

    Votre migration PLM mérite mieux qu’une découverte des problèmes au go-live.

    Un Audit Flash Kleria identifie en 48 heures les données techniques à risque dans votre système PLM actuel, avant que la migration ne commence.

    ⚡ Réponse sous 48h · Aucun engagement · 100% confidentiel · Garanti VAGANET Group

    ⚡Key takeaways in 30 seconds

    1. 83% of data migration projects fail or exceed their original budgets and timelines (Gartner). Only 16% of migrations are completed within their original timeline and budget. Projects that exceed their targets experience an average cost overrun of 30% and a schedule delay of 41% (Bloor Research).
    2. The 5 critical risks of poorly prepared PLM/CAD migration: loss of CAD drawings, BOM structure corruption, broken PLM-ERP digital thread, loss of regulatory ECO/ECN traceability, and go-live disruption combined with budget overruns.
    3. PLM migrations are riskier than conventional ERP migrations because technical data (CAD drawings, multi-level BOMs, revision histories) contains complex hierarchical dependencies that generic migration tools cannot properly handle without specific preparation.
    4. 2026 is a critical year: the end of legacy Windchill licenses (after September 2026), pressure to migrate to SAP S/4HANA (2027 deadline), and Industry 4.0 ambitions all require a clean digital thread connecting PLM, ERP, and MES systems.
    5. The sequence of operations is decisive: source data auditing must take place before target system configuration, not after. Treating data quality as a final project task is one of the main causes of go-live failures.
    6. Prevention costs far less than remediation: manually reconstructing lost CAD drawings or correcting corrupted BOMs can cost 3 to 5 times more than preparing data upfront, often under the worst possible conditions: exhausted teams, impatient management, and production downtime.
    7. KLERIA’s Zero-Backlog Engine™ methodology audits source PLM data within 48 hours, handles the cleansing and qualification of technical master data, and prepares data for migration before the migration project begins, not after go-live.

    Un backlog de données qui menace votre go-live ? Nos experts le cartographient en 48h, gratuitement.