Industrial AI data backlog – KLERIA

1. The promise of industrial AI vs. the reality on the ground

What industrial AI projects promise

A 15–30% reduction in scrap rates. Predictive maintenance with 90% accuracy. Backlogs cleared within six months. Autonomous agents operating on assembly lines. These are the claims we see in industrial leadership announcements and ERP/PLM vendors’ roadmaps. They are also what your industry peers share internally on LinkedIn to promote digital transformation.

On paper, everything looks aligned.

What actually happens in 80% of cases

On the ground, the reality is far less encouraging. According to several industry analyses (Gartner, McKinsey, and feedback from industrial systems integrators), **more than 80% of industrial AI proofs of concept (POCs) never make it into production.

In practical terms:

80%

The RAND Corporation documents a failure rate of more than 80% for AI projects, twice the rate of traditional IT projects.

50%

Gartner confirms that approximately 50% of GenAI projects are abandoned after the POC stage due to poor data quality.

Source : Gartner

In manufacturing, McKinsey confirms that AI deployments struggle to scale precisely because of data debt.

Source : Bloor Research

Le coupable : pas l’algorithme, mais la donnée

Gartner predicts that by 2026, 60% of AI projects unsupported by “AI-ready” data will be abandoned.

The algorithm is rarely the limiting factor. The models already exist, are accessible, and are well documented. The real bottleneck is the quality, completeness, and structure of the industrial data they rely on. And this is precisely the responsibility nobody wants to take on internally because the work is tedious, time-consuming, and politically risky.

“We hired two top-tier data scientists. Six months later, they were spending 80% of their time cleaning up Excel files, corrupted SAP exports, and CAD drawings with no metadata. We could have trained the model in three weeks.” Industrial Director, Energy Sector.

– First step

 

🔎 Facing a GMP deadline, an AS9100 audit, an S/4HANA migration, or a stalled AI project?

There’s only one answer: let’s talk. Free 48-hour assessment, strictly confidential, backed by VAGANET Group.

2. Why your industrial data is not AI-ready

Orphaned part numbers, unqualified records, and hidden duplicates

In a typical mid-sized industrial company, an audit of the Part Number (PN) database commonly reveals:

  • 15–35% of PNs are unqualified (unknown status, missing critical information).
  • 5–12% are exact or near-duplicate records, created through entity mergers, abandoned projects, or failed SAP migrations.
  • Thousands of “ghost” PNs created for cancelled projects and never removed.

Out of 100,000 PNs, it is not uncommon to find between 25,000 and 45,000 records that cannot be used as-is by an algorithm. Training a model on this data means accepting industrial decisions built on shaky foundations.

Scattered CAD drawings, untracked revisions

The engineering department is a typical example. CAD drawings are scattered across shared folders, legacy PDM servers, and poorly indexed Vault archives. Revisions are not properly tracked. Two versions of the same drawing may have been coexisting in production for 18 months. Nobody knows which one is the “correct” version.

An algorithm trained on this data learns inconsistencies rather than the physical reality of your products. This is an invisible but critical flaw.

Legacy data: outdated formats, silos, and undocumented business rules

One former division has its own CSV format. Another still relies on an Access 2003 database stored on a network drive. A third uses a custom Python script that only one retired employee knows how to maintain. This is industrial technical debt: the data assets you have accumulated over 10, 20, or sometimes even 30 years. Legacy is not a storage problem. It is a problem of meaning. The data exists, but its meaning has been lost, fragmented, or is known by only three people.

When QA data quality becomes the weakest link

In the pharmaceutical, aerospace, and medical device industries, QA compliance is not just a regulatory requirement. It is structural. If your data is not traceable, version-controlled, and compliant with GMP/AS9100/IATF requirements, it is not AI-ready. No AI system can reliably rely on unauditable data. A regulatory audit will eventually expose the issue anyway.

Summary: industrial technical debt, the invisible iceberg

Above the surface: your data dashboards, BI tools, and POCs. Below the surface: massive volumes of unqualified, non-standardized, and undocumented data. You may not notice it until you try to put that data to industrial use.

📊 Mini-study (KLERIA – 2024, anonymized, sample of 12 mid-market industrial companies)

  • Average share of unqualified PNs: 28% of total records
  • CAD drawings with partial traceability: 47%
  • Legacy data not migrated to the target information system: approximately 38%
  • Average time data scientists spend preparing data: 45% of their time (consistent with the Anaconda State of Data Science covering more than 2,400 practitioners)

This invisible data backlog is what silently puts a ceiling on your ambitions for AI, ERP, cloud PLM, and automation.

3- The real cost of launching an AI project with unqualified data

Direct costs: Endless POCs and underutilized AI teams

A data scientist costs an average of €70,000 to €110,000 per year in fully loaded employment costs in France. If 65% of their time is spent on manual data cleaning, that represents €45,000 to €70,000 per year per employee spent on non-strategic tasks. For a team of four, this amounts to €180,000 to €280,000 per year in salaries essentially dedicated to compensating for data debt.

Hidden costs: Lost opportunities and project timelines multiplied by 2 or 3

An AI project initially expected to be delivered in six months ends up taking 12 months, sometimes even 18. Meanwhile:

  • The market opportunity closes.
  • Internal sponsors (Executive Committee) lose confidence.
  • Internal teams become demotivated.
  • Competitors move ahead, sometimes with less data, but better-structured data.

Organizational costs: Team demotivation and sponsor skepticism

This is the most underestimated cost. A POC that fails once becomes a POC that no longer receives funding. A sponsor who has been burned once may block the next initiative. A data team worn down by repetitive cleaning tasks may leave. The internal credibility capital needed to drive digital transformation is a finite resource. Wasting it on unqualified data is a strategic loss.

Summary table: Before vs. After data qualification
Metric Unqualified data (typical state) AI-ready data (KLERIA Zero-Backlog Method)
Usable part numbers (PNs) 65–75% of the inventory 100% qualified and documented
CAD traceability Partial, with multiple data sources Version-controlled, single source of truth, and audited
Legacy formats Heterogeneous and non-standardized Standardized and migrated to the target information system
QA compliance Risk of audit non-compliance Standardized and auditable framework
Data scientists' time spent on data cleaning ~65% <15%
AI deployment timeline 12 to 18 months 3 to 6 months
Project risk High (endless POCs) Measurable and managed through KPIs

Want to know the true state of your data before restarting or launching an AI project?

Our experts assess the actual state of your industrial backlog within 48 hours, with no commitment and complete confidentiality.




    4- The invisible prerequisite: qualifying and standardizing the backlog before industrializing AI

    Industrial AI starts before AI. It starts with data. The selected methodology aligns with the six AI data readiness disciplines identified by McKinsey: strategy, quality, platform, governance, compliance, and culture. It focuses on the first two, where industrial backlogs are most likely to fall behind.

    Phase 0 

    Audit: Mapping what you actually have

    Before taking any action, a structured inventory is essential: volume, status, quality, regulatory criticality, and downstream dependencies. This is what distinguishes a professional approach from an improvised one.

    Phase 1

    Clean and standardize: Stabilizing formats, fields, and statuses

    Templates, mandatory fields, statuses, and reference formats: everything is reviewed and standardized. This step lays the foundation for everything that follows.

    Phase 2

    Document: Making data auditable and reproducible

    Undocumented data cannot be industrialized. Every part number (PN), every drawing, and every business rule must have traceable documentation that complies with industry QA standards.

    Phase 3

    Activate: Batch processing and targeted automation

    Move data into action through batch processing and targeted automation. This makes it possible to streamline repetitive tasks, accelerate processing, and establish reliable workflows that support industrial AI deployment.

    5- Real-world case studies (anonymized): AI-ready data in 90 days

    💊Pharma & Biotech: 7,000 part numbers cleared in 90 days, zero regulatory deviations

    Context:

    A global leader in bioprocess equipment was facing a critical backlog of 7,000 unqualified part numbers (PNs) in its SAP environment following a multi-site catalog consolidation. The GMP deadline was non-negotiable, and internal teams were already at full capacity.

    KLERIA Zero-Backlog Method implementation:

    • Immersion (Week 1): SAP tools, business rules, GMP requirements, and legacy systems.
    • Triage and standardization (Weeks 2–4): Impact-based classification, data cleansing, and stabilization of input rules.
    • Large-scale processing (Weeks 5–10): Batch processing, systematic peer reviews, and QA checks for every batch.
    • Delivery (Week 12): Complete qualification documentation, regulatory checks, and zero validated deviations.

    Results: 7,000 PNs processed. Deadline met. Zero regulatory deviations. More importantly, the data is now AI-ready. The client’s predictive maintenance and catalog rationalization projects are now built on a reliable data foundation.

    ✈️Aerospace & Defense: A traceable CAD repository compliant with AS9100

    Context:

    A Tier 2 aerospace supplier was facing a critical fragmentation of CAD drawings across three sites, multiple PDM tools (CATIA, NX, SolidWorks), and an estimated 40% of revisions that were not properly tracked. An AS9100 audit was scheduled in eight months.

    Intervention:

    • Complete inventory and mapping of the drawing repository (~12,000 drawings).
    • Metadata standardization and consolidation into a unified repository.
    • Migration to a cloud-native target PDM system compliant with AS9100.
    • Implementation of traceable revision management rules.

    Results:

    100% of critical drawings tracked and version-controlled within six months. The AS9100 audit was completed with no major non-conformities. The client was able to launch its AI-powered design anomaly detection project the following year.

    ⚡Energy / Oil & Gas: Legacy migration to a modern ERP system

    Context:

    A mid-market energy company had been managing 20 years of equipment data in a legacy ERP system (proprietary format, partially documented), while undergoing a migration to S/4HANA. Critical Safety & Maintenance data posed a major operational risk.

    Intervention:

    • Audit of the equipment data inventory (~85,000 records).
    • Standardization of the equipment master data and bills of materials.
    • Batch migration with peer reviews and quality checks.
    • Implementation of real-time migration KPIs.

    Results:

    Equipment data migrated with 99.2% completeness. The S/4HANA project was completed on schedule, and the predictive maintenance plan was activated as soon as the new ERP system went live.

    These three case studies share one key lesson that is often overlooked in LinkedIn discussions: successful AI projects are built on data foundations that have been addressed first.

    You may also find this article interesting:

    6- How to tell whether your industrial data is AI-ready

    Questions to ask internally

    You don’t need a consultant to get started. Ask your data, PLM, and QA teams these seven questions:

    1. What percentage of your part numbers (PNs) is currently qualified, standardized, and fully usable?
    2. How many of your CAD drawings are version-controlled within a single repository and fully traceable?
    3. What is the volume of legacy data that has not yet been migrated to your target information system?
    4. Are your QA rules documented, reproducible, and aligned with your applicable industry standards (GMP, AS9100, IATF, ISO)?
    5. How much time do your data teams spend on data cleaning compared with analysis?
    6. Is there an identified data owner for every critical segment of your database?
    7. If you were asked tomorrow to provide a comprehensive inventory of your industrial data assets, how long would it take?

    What your answers really tell you

    • 0–1 negative answers: You are AI-ready. Your next challenge is industrialization.
    • 2–3 negative answers: Your technical debt is manageable, but it is becoming a limiting factor.
    • 4+ negative answers: Your next AI, cloud ERP, or cloud-native PLM project could be at risk before it even begins.

    Quick assessment: Where do you really stand?

    If you fall into the last category, your problem is probably not the algorithm. It is unqualified data. And that is precisely where KLERIA comes in.

    FAQ : Vos questions sur la donnée industrielle et l’IA

    It is the accumulation of industrial data (part numbers, CAD drawings, bills of materials, QA data, equipment data) that has not been qualified, standardized, or documented according to the standards required by your information systems and regulatory obligations. This backlog often remains invisible until a strategic project (cloud ERP, PLM, or AI) brings it to the surface.
    Because they are launched using data that is not AI-ready. Data scientists spend most of their time cleaning, deduplicating, and qualifying data instead of building models. POCs fail to scale, timelines expand, and internal confidence erodes. The solution is not a better algorithm, but a methodical preprocessing of the industrial backlog.
    It depends on the volume and criticality of the data. For an inventory of 5,000 to 15,000 part numbers (PNs), a structured approach (mapping → standardization → batch processing) typically takes 6 to 12 weeks. For more complex cases (30,000 to 100,000 PNs + CAD + legacy data), it generally takes 3 to 6 months. This is precisely the commitment behind the KLERIA Zero-Backlog Method.
    Industries with extensive regulatory requirements and large data assets are the most exposed: pharma/biotech (GMP, FDA), aerospace/defense (AS9100), energy/oil & gas, and medical devices. In practice, however, all mid-sized industrial companies accumulate data debt when they have more than 15 years of production history.
    In-house processing works if you have the right team, sufficient time, and executive sponsorship. In practice, most industrial departments find that their internal experts are already overwhelmed with ongoing projects. Processing the backlog internally simply shifts the workload rather than eliminating it. Specialized outsourcing, with a structured methodology, peer review, and confidentiality guarantees, is often the fastest and safest approach.
    Three safeguards are non-negotiable: 1. Strict contractual confidentiality: An extended Non-Disclosure Agreement (NDA). 2. Systematic client anonymity: Deliverables never disclose your company’s name. 3. Parent-group-level governance: A group-level commitment that protects its reputation on every engagement. This is exactly how the VAGANET Group ↔ KLERIA framework operates.

    No commitment · Results within 48 hours

     

    Where should you start?

    With a 48-hour industrial backlog audit. No commitment, no vague quotes, and strict confidentiality. You will receive a clear overview of your data debt, along with a concrete service recommendation tailored to your needs.

    ⚡ Response within 48 hours · No commitment · 100% confidential · Backed by VAGANET Group

    ⚡Key takeaways in 30 seconds

    1. Industrial AI starts before AI. It starts with data. Without a qualified backlog, AI cannot be industrialized.
    2. Industrial technical debt is an invisible but very real cost. It limits your projects, exhausts your teams, and gradually erodes internal credibility.
    3. Methodical backlog preprocessing is a ROI multiplier for all your digital projects. AI, cloud ERP, cloud-native PLM, automation, and autonomous agents all become scalable and industrializable when built on a qualified data foundation

    Un backlog de données qui menace votre go-live ? Nos experts le cartographient en 48h, gratuitement.

    Table of contents

    STAY INFORMED

    Subscribe to our FREE newsletter.