What the numbers reveal about data migration
Avant d’entrer dans les 5 risques spécifiques à la migration PLM/CAO, il faut regarder en face la réalité statistique des migrations de données dans l’industrie IT.
These statistics relate to IT migrations in general. In PLM and CAD environments, however, specific factors make the risks even greater: technical data is structurally more complex than business data, involving multi-level hierarchical relationships, native links between CAD files and metadata, and revision histories that must remain intact to ensure regulatory traceability. A data corruption issue in an ERP system may result in an accounting error. In a PLM system, the same issue can lead to production downtime or non-compliance during a customer audit.
The 5 critical risks of PLM/CAD migration without proper data preparation
Behind every recurring non-conformity lies a systemic cause. In an industrial environment where the ERP system serves as the central source of truth and interacts with a PLM, MES, quality management tools, and suppliers, these causes almost always trace back to the quality of master data.
Summary table: 5 risks, root causes, and warning signs
Certain operational warning signs indicate that recurring quality issues originate in master data quality rather than process or equipment failures. Here is what to look for.
Managing non-conformities: going beyond corrective action
ISO 9001:2015 requires organizations to implement a structured non-conformity management process. In practice, however, this process often stops at immediate corrective action without investigating the underlying systemic documentation issues.
Here is how to structure a process that goes all the way back to the source.
| Risk | Most common root cause | Warning sign before go-live | Post-go-live impact |
|---|---|---|---|
| Loss of CAD drawings | Incomplete mapping of vault structures and CAD-Part relationships | Migration tests performed on dummy data instead of real data | Critical Production of parts without drawings |
| Corrupted BOMs | Revision management incorrectly mapped between source and target systems | No business validation testing by the engineering department | Critical Manufacturing orders based on unapproved specifications |
| Broken PLM–ERP digital thread | Interfaces not updated after changes to data identifiers | PLM-ERP integrations not tested in the target environment | High Procurement relying on outdated master data |
| Loss of traceability | ECO histories excluded from migration to reduce data volume | "Active data only" policy without mapping regulatory requirements | Critical Non-compliance during customer audits |
| Budget overruns and go-live disruption | Source data not audited — data volume and quality underestimated | No data audit before migration begins | High +30% average cost overrun, +41% schedule delay |
How to identify whether your non-conformities originate from data quality issues
Pressure on PLM migrations has never been greater than in 2026, driven by three converging trends that are shortening decision-making windows for CIOs and Manufacturing Directors.
1. The end of legacy Windchill licenses and the shift to Windchill+
PTC introduced its new ePLM licensing model on July 1, 2025. Existing Windchill license packages moved to a “renewals only” model. As of September 30, 2026, legacy licenses can no longer be renewed. Companies still running Windchill 12 (whose standard support ended in June 2024) or Windchill 13 (with support scheduled to end in June 2027) face two simultaneous pressures: end of support and end of licensing. This constraint forces migration decisions that some manufacturers would otherwise have preferred to postpone.
2. The SAP S/4HANA migration is also driving PLM changes
The migration to SAP S/4HANA (with the 2027 deadline for standard ECC support) is not an isolated ERP project. It requires companies to review their existing PLM-ERP interfaces, which, in most industrial architectures, means migrating or significantly redesigning PLM connectors. These two projects often run in parallel, creating additional pressure on IT and engineering teams.
3. Industry 4.0 ambitions require a clean digital thread
Digital twin, predictive maintenance, and industrial AI projects all rely on a common prerequisite: a clean, traceable, and consistent digital thread connecting PLM, ERP, and MES systems.
Gartner predicts that by 2030, more than 30% of industrial manufacturers will rely on a PLM-based digital thread to contextualize data used to train their AI models (Manufacturing Predicts 2026, Gartner, décembre 2025). But these systems cannot deliver reliable results with degraded data. A poorly prepared migration is one of the fastest ways to permanently undermine the quality of technical master data.
How KLERIA secures your PLM/CAD migration before it begins
The main problem with poorly prepared PLM migrations is not technology. It is the sequence of operations. Companies choose the target system, sign the licenses, launch the migration project, and treat source data quality as a final project task. By that stage, it is already too late to prevent problems. The project is in reactive mode.
KLERIA’s Zero-Backlog Engine™ methodology reverses this sequence. Source data auditing comes first, before target system configuration, before mapping, and before testing. We take care of this analysis and preparation work so your team can execute the migration using data that has already been assessed and qualified, rather than discovering problems at go-live.
FAQ: PLM CAD data migration